logo

Microsoft and G42 Geothermal-Powered Data Centre

Sector: Geothermal • Location: Kenya

Source: ThinkGeoEnergy

Project
Suspended

A planned geothermal-powered data centre to be built by Microsoft and UAE-based AI firm G42, intended to run on geothermal power from the Olkaria geothermal field and be part of KenGen's Green Energy Park. The data centre was expected to require about 1 GW of power and be operational by May 2026.

Status
Failure
Sector
Geothermal, Power Generation (CCGT), Government, Data Center
Location
Kenya
Updated
22 Jul 2026
Source
ThinkGeoEnergy

ConstructChat

Ask ConstructChat about Microsoft and G42 Geothermal-Powered Data Centre

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Microsoft and G42 Geothermal-Powered Data Centre” is an infrastructure initiative in the Geothermal sector, located in Kenya. Taiyo aggregates data on it from ThinkGeoEnergy.

Participants

Not available for this record.

Status

Original status

suspended

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A planned geothermal-powered data centre to be built by Microsoft and UAE-based AI firm G42, intended to run on geothermal power from the Olkaria geothermal field and be part of KenGen's Green Energy Park. The data centre was expected to require about 1 GW of power and be operational by May 2026.

Original sector

Energy

Budget

Location

Country

Kenya

Source

Source

ThinkGeoEnergy

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Government, Data Center

Article published date

2026-05-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project