Microsoft and G42 Geothermal-Powered Data Centre
Sector: Geothermal • Location: Kenya
Source: ThinkGeoEnergy
A planned geothermal-powered data centre to be built by Microsoft and UAE-based AI firm G42, intended to run on geothermal power from the Olkaria geothermal field and be part of KenGen's Green Energy Park. The data centre was expected to require about 1 GW of power and be operational by May 2026.
- Status
- Failure
- Sector
- Geothermal, Power Generation (CCGT), Government, Data Center
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- ThinkGeoEnergy
ConstructChat
Ask ConstructChat about Microsoft and G42 Geothermal-Powered Data Centre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | suspended |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A planned geothermal-powered data centre to be built by Microsoft and UAE-based AI firm G42, intended to run on geothermal power from the Olkaria geothermal field and be part of KenGen's Green Energy Park. The data centre was expected to require about 1 GW of power and be operational by May 2026. |
Original sector | Energy |
Budget |
Location
Country | Kenya |
Source
Source | ThinkGeoEnergy |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Government, Data Center |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
