Microsoft and Nscale AI Data Center in Essex
Postponed · England · Last reported Apr 2026
Source: Xpert.Digital - Konrad Wolfenstein
A planned AI data center project by Microsoft and Nscale in Loughton, Essex, UK, intended to be the largest AI data center in the UK with a capacity of 50 megawatts. The project was postponed from 2026 to at least 2027 due to concerns about local power grid capacity and impact on household electricity prices, requiring a new planning application.
- Status
- Prospective
- Sector
- Data Center, Power Generation (CCGT)
- Location
- Loughton, England, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Xpert.Digital - Konrad Wolfenstein
ConstructChat
Ask ConstructChat about Microsoft and Nscale AI Data Center in Essex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | postponed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A planned AI data center project by Microsoft and Nscale in Loughton, Essex, UK, intended to be the largest AI data center in the UK with a capacity of 50 megawatts. The project was postponed from 2026 to at least 2027 due to concerns about local power grid capacity and impact on household electricity prices, requiring a new planning application. |
Original sector | Technology |
Location
Country | United Kingdom (UK) |
State | England |
City | Loughton |
Source
Source | Xpert.Digital - Konrad Wolfenstein |
URL |
More Details
Record type | Project |
Sector | Data Center, Power Generation (CCGT) |
Article published date | 2026-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Data Center projects in United Kingdom
- An upper-limb rehabilitation exoskeleton robot based on AI and cloud computing
- INnovatiVE cohereNt detecTIon Optical access Networks
- Meeting 100Gbps Ethernet Requirements with CMOS Integrated Circuit Chipset to Dramatically Cut Energy Use in Data Centres
- JCA Engineering
- Data Centre World UK
- A Novel Loop-Heat-Pipe (LHP)-based Data Centre Heat Removal and Recovery System Employing the Micro-channels Cold/Hot Plates
- HMRC Data Center Exit Contract
- Google Data Center in Waltham Cross
