logo
ProjectStart

Microsoft Building Floor 1

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Comm Ti - 2021 Ibc - Microsoft Floor 1 - Construct An Approximately 663 Square Foot Server Room With Sound Dampening Walls. All Work Is Interior In An Existing Warehouse Space, No Change In Occupancy Type. No Changes To Existing Exterior Building Enclosure Are Proposed. No Site Work Or Changes To Existing Landscaping Or Parking Proposed.Nexisting Fire Protection Systems Must Be Maintained In Fully

Status
Prospective
Sector
Manufacturing (Industrial), Car parking, Warehouse, Residential, Automotive, Commercial
Location
Redmond, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Microsoft Building Floor 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Microsoft Building Floor 1” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Redmond, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Comm Ti - 2021 Ibc - Microsoft Floor 1 - Construct An Approximately 663 Square Foot Server Room With Sound Dampening Walls. All Work Is Interior In An Existing Warehouse Space, No Change In Occupancy Type. No Changes To Existing Exterior Building Enclosure Are Proposed. No Site Work Or Changes To Existing Landscaping Or Parking Proposed.Nexisting Fire Protection Systems Must Be Maintained In Fully Functioning Order During Construction. Total Area Of Construction = 663 Sf

Budget

Location

Country

United States of America (USA)

State

Washington

City

Redmond

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Car parking, Warehouse, Residential, Automotive, Commercial

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project