Microsoft Data Center Power Equipment Upgrade
Sector: Road • Location: San Jose, California, United States
Source: The Mercury News
PG&E has proposed power equipment upgrades in San Jose to serve a future Microsoft data hub. The project involves installing 115-kilovolt transmission upgrades at the Los Esteros Substation and a new 115-kilovolt transmission line to provide dedicated, redundant backup service. The data center is planned to operate 24/7 and aims to launch operations in January 2027.
- Status
- Prospective
- Sector
- Road, Power Generation (CCGT), Data Center
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- The Mercury News
ConstructChat
Ask ConstructChat about Microsoft Data Center Power Equipment Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PG&E has proposed power equipment upgrades in San Jose to serve a future Microsoft data hub. The project involves installing 115-kilovolt transmission upgrades at the Los Esteros Substation and a new 115-kilovolt transmission line to provide dedicated, redundant backup service. The data center is planned to operate 24/7 and aims to launch operations in January 2027. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | The Mercury News |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Data Center |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
