logo

Microsoft Data Centers

Sector: Commercial • Location: United States of America (USA)

Source: ENR News

Project
Under Planning

Microsoft Corp. is planning to construct data centers on a 120-acre site in East Wenatchee. The EAT06 and EAT09 data center project scope includes construction of two interconnected single-story buildings totaling 250,530 sq ft, and purchase and installation of power redundancy, continuous power and power distribution systems, standby power generators, underfloor cable pathways and overhead cable

Project Information FAQ

Project Information

3 Q
The project “Microsoft Data Centers” is an infrastructure initiative in the Commercial sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Microsoft Corp. is planning to construct data centers on a 120-acre site in East Wenatchee. The EAT06 and EAT09 data center project scope includes construction of two interconnected single-story buildings totaling 250,530 sq ft, and purchase and installation of power redundancy, continuous power and power distribution systems, standby power generators, underfloor cable pathways and overhead cable trays, data and voice patch panels, a fiber optic backbone, security systems, high-output cooling systems, power cabling, circuit breakers, isolators, transformers and switchgear. Environmental Systems Design Inc. has been selected to provide engineering services, and Sheehan Nagle Hartray Architects, a Woolpert company, has been selected to provide design services for the buildings. Site work is underway for EAT06; the building is expected to be completed in early 2026. A construction schedule for EAT09 has not been developed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data