logo
ProjectAwarded

Microsoft Malaga Data Center Power Supply Contract

The owner, status and timeline of this project. A free account opens every field.

Source: NewsRadio 560 KPQ

Chelan PUD approved a contract to supply power to Microsoft's data center campus in Malaga. The contract includes provisions for stable rates, a load maximum of 288 megawatts for 15 years with options to extend, and full control retention by Chelan PUD over hydroelectric projects. Microsoft paid $86.5 million upfront for the Jumpoff Ridge substation and other improvements needed to serve the data

Status
Closed
Sector
Data Center, Power Generation (CCGT), Government, Power Transmission
Location
Malaga, Washington, United States of America
Updated
22 Jul 2026
Source
NewsRadio 560 KPQ

ConstructChat

Ask ConstructChat about Microsoft Malaga Data Center Power Supply Contract

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Microsoft Malaga Data Center Power Supply Contract” is an infrastructure initiative in the Data Center sector, located in Malaga, Washington, United States. Taiyo aggregates data on it from NewsRadio 560 KPQ.

Participants

Sponsoring Agency

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Chelan PUD approved a contract to supply power to Microsoft's data center campus in Malaga. The contract includes provisions for stable rates, a load maximum of 288 megawatts for 15 years with options to extend, and full control retention by Chelan PUD over hydroelectric projects. Microsoft paid $86.5 million upfront for the Jumpoff Ridge substation and other improvements needed to serve the data center.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Washington

City

Malaga

Source

Source

NewsRadio 560 KPQ

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Government, Power Transmission

Article published date

2025-06-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project