logo

Mid-Breton Sediment Diversion

Sector: Water Supply and Storage • Location: United States of America (USA)

Source: ENR News

Project
Bids, Contracts, Proposals

Louisiana The Louisiana Coastal Protection & Restoration Authority has chosen Stantec to oversee the engineering and design of the Mid-Breton Sediment Diversion near Wills Point on the east bank of the Mississippi River in Plaque­mines Parish, near river mile 69 above Head of Passes. The project will entail construction of an inlet channel, a gated structure in the river levee, a conveyance channe

Project Information FAQ

Project Information

5 Q
The project “Mid-Breton Sediment Diversion” is an infrastructure initiative in the Water Supply and Storage sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

bids, contracts, proposals

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Louisiana The Louisiana Coastal Protection & Restoration Authority has chosen Stantec to oversee the engineering and design of the Mid-Breton Sediment Diversion near Wills Point on the east bank of the Mississippi River in Plaque­mines Parish, near river mile 69 above Head of Passes. The project will entail construction of an inlet channel, a gated structure in the river levee, a conveyance channel to move the sediment and water into the wetlands and open water, and a complex of outlet channels. It is intended to move up to 35,000 cu ft per second of water and sediment from the river into wetlands between the river and Lake Borgne, with the expectation that the sediment will nourish existing wetlands and build new wetlands in open water. Construction is expected to begin in 2023.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data