Middle School Campus Visitor Locker Facility
Sector: Power Generation (CCGT) • Location: Stroud, Oklahoma, United States of America
Source: Dodge
Construction of New Visitor Locker Room Facility including earthwork and site grading, site utilities, paving, curbs and gutters, landscaping, concrete foundation system, concrete floor slab, masonry construction, TPO roofing system on metal deck, EIFS, masonry veneer, steel joists, concrete block walls, suspended acoustical ceilings, hollow metal doors and frames, wood doors, door hardware, ceram
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Power Transmission, Metal, Education, Cement, Commercial, Steel
- Location
- Stroud, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Middle School Campus Visitor Locker Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of New Visitor Locker Room Facility including earthwork and site grading, site utilities, paving, curbs and gutters, landscaping, concrete foundation system, concrete floor slab, masonry construction, TPO roofing system on metal deck, EIFS, masonry veneer, steel joists, concrete block walls, suspended acoustical ceilings, hollow metal doors and frames, wood doors, door hardware, ceramic tile, vinyl tile, painting, fire alarm system, HVAC, plumbing, electrical and lighting systems... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Stroud |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Power Transmission, Metal, Education, Cement, Commercial, Steel |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
