MI/DOT : Hot Mix Asphalt
Sector: Water Supply and Storage • Location: Jackson, Michigan, United States of America
Source: Dodge
Scope - The Project includes Materials, Labors and Equipment for0.31 mi of hot mix asphalt construction of center left turn lane, ditching, storm sewer and pavement markings on M-50 at Clark Lake Road, Jackson County. ** 739 Cb or 739 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contract
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Jackson, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MI/DOT : Hot Mix Asphalt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for0.31 mi of hot mix asphalt construction of center left turn lane, ditching, storm sewer and pavement markings on M-50 at Clark Lake Road, Jackson County. ** 739 Cb or 739 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Jackson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
