MI/DOT: Bridge Replacement
Sector: Consumer Products • Location: Walker, Michigan, United States of America
Source: Dodge USA
Design for Bridge Replacement of S01 of 41026 State of Michigan Walker, MI Transportation SCOPE OF WORK Design services for bridge replacement of S01 of 41026 Fruit Ridge Ave over I-96, reconstruction and widening of Fruit Ridge Ave from 3 Mile Rd to Northridge Dr, realignment and reconstruction of the interchange ramps, incorporation of non motorized facilities, and traffic signal design located
- Status
- Prospective
- Sector
- Consumer Products, Bridge, Commercial, Road
- Location
- Walker, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MI/DOT: Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Design for Bridge Replacement of S01 of 41026 State of Michigan Walker, MI Transportation SCOPE OF WORK Design services for bridge replacement of S01 of 41026 Fruit Ridge Ave over I-96, reconstruction and widening of Fruit Ridge Ave from 3 Mile Rd to Northridge Dr, realignment and reconstruction of the interchange ramps, incorporation of non motorized facilities, and traffic signal design located on EB/WB I-96 from 2800' west of Fruit Ridge Ave to 3000' east of Fruit Ridge Ave in the city of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Walker |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Bridge, Commercial, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
