MI/DOT: I-75 Noise Wall Construction & Other Impr
Closed · Michigan · Last reported Sep 2025
Source: Dodge
0.33 mi of noise wall construction and 0.34 mi of existing noise wall rehabilitation including concrete surface coating of existing and proposed walls, construction of proposed ditch and existing ditch cleanout on I-75 Northbound from north of Northline Road to south of Goddard Road in the city of Southgate, Wayne County. This project includes a 2 year concrete surface coating warranty
- Status
- Closed
- Sector
- Cement, Road, Manufacturing (Industrial), Commercial
- Location
- Southgate, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MI/DOT: I-75 Noise Wall Construction & Other Impr
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 0.33 mi of noise wall construction and 0.34 mi of existing noise wall rehabilitation including concrete surface coating of existing and proposed walls, construction of proposed ditch and existing ditch cleanout on I-75 Northbound from north of Northline Road to south of Goddard Road in the city of Southgate, Wayne County. This project includes a 2 year concrete surface coating warranty |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Southgate |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
