MI/DOT: M-22 Road Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Design services for the reconstruction of M-22 from Hilltop Road to Cedar Street including the removal of the existing concrete roadway and reconstructing with HMA. Project includes geometric and drainage improvements. Required work includes culvert investigations and utility coordination.
- Status
- Prospective
- Sector
- Cement, Power Transmission, Road, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Bingham Township, Michigan, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MI/DOT: M-22 Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Design services for the reconstruction of M-22 from Hilltop Road to Cedar Street including the removal of the existing concrete roadway and reconstructing with HMA. Project includes geometric and drainage improvements. Required work includes culvert investigations and utility coordination. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Bingham Township |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Power Transmission, Road, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
