logo

MI/DOT: M-30 Bridge Reconstruction (CO 201)

Sector: Water Supply and Storage • Location: Gladwin, Michigan, United States of America

Source: Dodge USA

Project
Closed

0.50 mi of bridge reconstruction including widening, superstructure replacement with 48-inch by 49- inch prestressed concrete bulb-tee beams, guardrail, steel piling, steel sheet piling, cofferdams, drainage and approach work on M-30 over Tobacco River, Gladwin County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year pavement performance warranty and a 2 year co

Status
Closed
Sector
Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Mass Transit, Rail, Metal, Commercial
Location
Gladwin, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MI/DOT: M-30 Bridge Reconstruction (CO 201)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MI/DOT: M-30 Bridge Reconstruction (CO 201)” is an infrastructure initiative in the Water Supply and Storage sector, located in Gladwin, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

0.50 mi of bridge reconstruction including widening, superstructure replacement with 48-inch by 49- inch prestressed concrete bulb-tee beams, guardrail, steel piling, steel sheet piling, cofferdams, drainage and approach work on M-30 over Tobacco River, Gladwin County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year pavement performance warranty and a 2 year concrete surface coating warranty. This is an OJT VIP Pilot Project. Please see Special Provision f...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Gladwin

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Mass Transit, Rail, Metal, Commercial

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project