MI/DOT: Road Reconstruction(CO015)
Sector: Steel • Location: Owosso, Michigan, United States of America
Source: Dodge USA
0.36 mi hot mix asphalt reconstruction, water main, storm and sanitary sewer, concrete curb, gutter, sidewalk and ramps, signal modernization, pavement markings and bridge rehabilitation that includes deck replacement, substructure and superstructure repair, clean and coat structural steel, scour protection and approach work in the city of Owosso, Shiawassee County. This project includes a 5 year
- Status
- Closed
- Sector
- Steel, Bridge, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Cement, Automotive, Metal, Commercial
- Location
- Owosso, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MI/DOT: Road Reconstruction(CO015)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 0.36 mi hot mix asphalt reconstruction, water main, storm and sanitary sewer, concrete curb, gutter, sidewalk and ramps, signal modernization, pavement markings and bridge rehabilitation that includes deck replacement, substructure and superstructure repair, clean and coat structural steel, scour protection and approach work in the city of Owosso, Shiawassee County. This project includes a 5 year materials and workmanship pavement warranty, a 2 year warranty on concrete surface coatings and 2... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Owosso |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Cement, Automotive, Metal, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
