logo
ProjectUnder Construction

Midpoint Solar Project

Under construction · Texas · Last reported May 2025

Source: POWER Magazine

The Midpoint Solar project, developed by Sunraycer, will provide 127 MWdc/97.5 MWac of energy to the ERCOT grid and is expected to begin commercial operation later this year.

Status
Under Construction
Sector
Power Generation (CCGT), Commercial, Solar
Location
Texas, United States of America
Updated
22 Jul 2026
Source
POWER Magazine

ConstructChat

Ask ConstructChat about Midpoint Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Midpoint Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Texas, United States. Taiyo aggregates data on it from POWER Magazine.

Participants

Company

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Midpoint Solar project, developed by Sunraycer, will provide 127 MWdc/97.5 MWac of energy to the ERCOT grid and is expected to begin commercial operation later this year.

Original sector

Renewable Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

POWER Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Solar

Article published date

2025-05-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project