Midtown Bus Terminal Replacement Project Phase 1
Sector: Road • Location: New York City, New York, United States
Source: Construction Digital
A joint venture between Turner Construction and STV has been appointed construction manager for Phase 1 of New York City's $10bn Midtown Bus Terminal Replacement project. Phase 1 includes the construction of an interim 900,000 square-foot seven-level bus terminal and ramp infrastructure to facilitate transport for over 200,000 daily commuters, enabling the full terminal replacement to proceed. The
- Status
- Under Construction
- Sector
- Road
- Location
- New York City, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Digital
ConstructChat
Ask ConstructChat about Midtown Bus Terminal Replacement Project Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A joint venture between Turner Construction and STV has been appointed construction manager for Phase 1 of New York City's $10bn Midtown Bus Terminal Replacement project. Phase 1 includes the construction of an interim 900,000 square-foot seven-level bus terminal and ramp infrastructure to facilitate transport for over 200,000 daily commuters, enabling the full terminal replacement to proceed. The project also involves construction of the Dyer Avenue deck-overs, which will be used to stage buses during construction and later converted into 3.5 acres of open green public space. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | Construction Digital |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
