Midtown Bus Terminal Replacement Project
Sector: Road • Location: New York City, New York, United States
Source: Construction Digital
A joint venture between Turner Construction and STV has been appointed construction manager for New York City's US$10 billion Midtown Bus Terminal Replacement project. Phase 1 includes construction of an interim 900,000 square-foot seven-level bus terminal and ramp infrastructure to facilitate transport for over 200,000 daily commuters, enabling the full terminal replacement to proceed.
- Status
- Under Construction
- Sector
- Road
- Location
- New York City, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Construction Digital
ConstructChat
Ask ConstructChat about Midtown Bus Terminal Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A joint venture between Turner Construction and STV has been appointed construction manager for New York City's US$10 billion Midtown Bus Terminal Replacement project. Phase 1 includes construction of an interim 900,000 square-foot seven-level bus terminal and ramp infrastructure to facilitate transport for over 200,000 daily commuters, enabling the full terminal replacement to proceed. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | Construction Digital |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
