MIDTOWN CONNECTOR IMPROVEMENTS
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The project proposes a “deck” spanning all lanes of the combined I-75/I-85 interstate facility commonly referred to as “The Connector”, with the exception of any off ramps or on ramps currently in operation. The southern terminus of the Project is to be in the vicinity of the North Ave. bridge, realizing that the final design may extend the Project boundary slightly south of the current bridge str
- Status
- Under Construction
- Sector
- Water Supply and Storage, Consumer Products, Bridge, Car parking, Road, Automotive, Government
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about MIDTOWN CONNECTOR IMPROVEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposes a “deck” spanning all lanes of the combined I-75/I-85 interstate facility commonly referred to as “The Connector”, with the exception of any off ramps or on ramps currently in operation. The southern terminus of the Project is to be in the vicinity of the North Ave. bridge, realizing that the final design may extend the Project boundary slightly south of the current bridge structure. The northern terminus of the Project is to be the existing 5th Street bridge and will not extend further than the current boundaries of the existing bridge plaza, although the final design may offer some design modifications to enhance the existing plaza elements. The deck structure will support soils, trees, shrubs, walkways and trail elements, park furniture, water features, lighting elements, art installations, Connector Park administration facilities, food & beverage facilities, pavilion, and other mutually desirable, allowable elements. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Bridge, Car parking, Road, Automotive, Government |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- West lake sammamish parkway phase 2
- 98th avenue se (97th place se) and se 11th street slope stabilization
- I-90 - sunset creek - fish passage
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- 2021 Water Main Replacement Project
- LEGALIZE ADDITION 394 SQ FT OF BATHROOM, PATIO COVER WATER HEATER RELOCATION & ASSOCIATED E/P. ADD NEW WALLS TO
