Midway Rising Phase 1
Sector: Manufacturing (Industrial) • Location: San Diego, California, United States of America
Source: Dodge
Phase 1 may include the demolition of nine structures and asphalt parking lots east of the proposed Frontier Drive, the construction of a new entertainment center while the existing San Diego Sports Arena remains operational, and the construction of residential units and commercial uses east of Frontier Drive. In addition, Phase 1 may include storm drain reroute, construction of Frontier Drive wit
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Stadium, Power Generation (CCGT), Power Transmission, Road, Consumer Products, Residential, Car parking, Automotive, Commercial, Waste Processing and Treatment
- Location
- San Diego, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Midway Rising Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phase 1 may include the demolition of nine structures and asphalt parking lots east of the proposed Frontier Drive, the construction of a new entertainment center while the existing San Diego Sports Arena remains operational, and the construction of residential units and commercial uses east of Frontier Drive. In addition, Phase 1 may include storm drain reroute, construction of Frontier Drive with dry and wet utilities, Rosecrans Street improvements, undergrounding of electrical utilities on... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Stadium, Power Generation (CCGT), Power Transmission, Road, Consumer Products, Residential, Car parking, Automotive, Commercial, Waste Processing and Treatment |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
