logo
ProjectPlanning Schematics

Midway Rising Phase 2

Planning schematics · California · Last reported Sep 2025

Source: Dodge

Phase 2 may include the demolition of five structures, including the existing San Diego Sports Arena and asphalt parking lots west of Frontier Drive. Phase 2 may include the construction of residential units and commercial uses west of Frontier Drive. Phase 2 may also include the construction of Kemper Street with dry and wet utilities, The Green, promenades, and streetscapes west of Frontier Driv

Status
Prospective
Sector
Manufacturing (Industrial), Stadium, Power Transmission, Road, Consumer Products, Residential, Power Generation (CCGT), Car parking, Automotive, Commercial
Location
San Diego, California, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Midway Rising Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Midway Rising Phase 2” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in San Diego, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Phase 2 may include the demolition of five structures, including the existing San Diego Sports Arena and asphalt parking lots west of Frontier Drive. Phase 2 may include the construction of residential units and commercial uses west of Frontier Drive. Phase 2 may also include the construction of Kemper Street with dry and wet utilities, The Green, promenades, and streetscapes west of Frontier Drive. Phase 2 may include off-site intersection improvements to the Rosecrans Street/ Lytton Street ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Diego

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Stadium, Power Transmission, Road, Consumer Products, Residential, Power Generation (CCGT), Car parking, Automotive, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project