logo
ProjectClosed

MIHO WATERSHE

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The main components of the Miho Watershed Development Project are: (a) construction of dams and canals to irrigate 8,315 ha; (b) conversion of 2,045 ha of cultivated upland to irrigate paddy fields in areas commanded by the above canals; (c) land consolidation, including construction of ditches, drains and farm roads together with land leveling and boundary realignment on 4,600 ha; (d) development

Status
Closed
Sector
Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government
Location
South Korea
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MIHO WATERSHE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MIHO WATERSHE” is an infrastructure initiative in the Road sector, located in Korea, Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main components of the Miho Watershed Development Project are: (a) construction of dams and canals to irrigate 8,315 ha; (b) conversion of 2,045 ha of cultivated upland to irrigate paddy fields in areas commanded by the above canals; (c) land consolidation, including construction of ditches, drains and farm roads together with land leveling and boundary realignment on 4,600 ha; (d) development of 495 ha for irrigation of upland crops, and 550 ha for orchards within the area to be irrigated; (e) upland reclamation, primarily bench-terracing of 1,200 ha of presently uncultivated land; (f) improvement of about 80 km of river channels to increase their flood discharge capacity; (g) construction of about 150 km of village access roads; (h) aerial photography, surveys, and mapping for the design of project works; and (i) provision of technical assistance, procurement of vehicles, and a feasibility study for a second-stage project in the Miho Watershed.

Original sector

Agriculture, Fishing and Forestry

Location

Country

South Korea

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project