Milepost 53 To 57 Reconstruction
Sector: Bridge • Location: Monroeville, Pennsylvania, United States of America
Source: Dodge USA
This project section is 4 miles in length and includes widening the existing turnpike mainline to accommodate six 12? lanes with 12? on the inside and outside shoulders. Also included in this section?s design are overhead and mainline structure (such as bridges and overpasses) replacements.
- Status
- Prospective
- Sector
- Bridge, Road, Commercial
- Location
- Monroeville, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Milepost 53 To 57 Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project section is 4 miles in length and includes widening the existing turnpike mainline to accommodate six 12? lanes with 12? on the inside and outside shoulders. Also included in this section?s design are overhead and mainline structure (such as bridges and overpasses) replacements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Monroeville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
