logo

Milestone-Based Fusion Development Program

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

Fusion energy is a potentially safe, abundant, zero-carbon-emitting source of reliable primary energy. Major recent worldwide advances in the science[1],[2],[3] and technology[4] of fusion energy, the emergence of a strong and growing private fusion sector in the United States and abroad,[5] and the objective of achieving “net-zero” global carbon emissions by 2050[6] have made the acceleration of

Project Information FAQ

Project Information

5 Q
The project “Milestone-Based Fusion Development Program” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Fusion energy is a potentially safe, abundant, zero-carbon-emitting source of reliable primary energy. Major recent worldwide advances in the science[1],[2],[3] and technology[4] of fusion energy, the emergence of a strong and growing private fusion sector in the United States and abroad,[5] and the objective of achieving “net-zero” global carbon emissions by 2050[6] have made the acceleration of fusion energy research, development, and demonstration (RD&D) a national priority. Augmenting the present scientific mission of the Office of Science (SC) Fusion Energy Sciences (FES) program with supporting “the development of a competitive fusion power industry in the U.S.” was both authorized in the Energy Act of 2020 and consistent with the recommendations of recent community-informed expert studies and reports, such as the 2020 Fusion Energy Sciences Advisory Committee (FESAC) Long-Range Plan Powering the Future [7] and the 2021 National Academies of Sciences, Engineering, and Medicine (NASEM) report Bringing Fusion to the U.S. Grid. [8] The latter helped motivate the White House Office of Science and Technology Policy (OSTP) and DOE to co-host a summit on Developing a Bold Decadal Vision for Commercial Fusion Energy .[9] A common theme among these recent activities was the recognition that public-private partnerships (PPPs) present an opportunity to accelerate fusion energy RD&D. A DOE-sponsored Workshop on Fusion Energy Development via Public-Private Partnerships was held recently (June 1–3, 2022); workshop presentations are posted publicly on the FES website.[10] This FOA invites applications for a new milestone-based fusion development program (as authorized in the Energy Act of 2020), which is a key component of the bold decadal vision to accelerate fusion energy RD&D in partnership with the private sector. Applications may be submitted for applied R&D to resolve scientific and technological issues toward the successful design of a fusion pilot plant (FPP).[11] [1] https://www.llnl.gov/news/national-ignition-facility-experiment-puts-researchers-threshold-fusion-ignition . [2] H. Abu-Shawareb et al., “Lawson Criterion for Ignition Exceeded in an Inertial Fusion Experiment,” Phys. Rev. Lett. 129 , 075001 (2022); https://www.nature.com/articles/d41586-022-00391-1 . [3] https://www.euro-fusion.org/news/2022/european-researchers-achieve-fusion-energy-record . [4] https://news.mit.edu/2021/MIT-CFS-major-advance-toward-fusion-energy-0908 ; https://cfs.energy/news-and-media/cfs-commercial-fusion-power-with-hts-magnet . [5] The Global Fusion Industry in 2022 , Fusion Companies Survey by the Fusion Industry Association. [6] https://www.iea.org/reports/net-zero-by-2050 . [7] https://science.osti.gov/-/media/fes/fesac/pdf/2020/202012/FESAC_Report_2020_Powering_the_Future.pdf [8] https://nap.nationalacademies.org/catalog/25991/bringing-fusion-to-the-us-grid [9] https://www.whitehouse.gov/ostp/news-updates/2022/03/15/fact-sheet-developing-a-bold-vision-for-commercial-fusion-energy and https://www.whitehouse.gov/ostp/news-updates/2022/04/19/readout-of-the-white-house-summit-on-developing-a-bold-decadal-vision-for-commercial-fusion-energy [10] https://science.osti.gov/fes/Community-Resources/Workshop-Reports [11] An FPP should demonstrate a significant amount of net fusion electricity (e.g., >50 MWe) for >3 continuous hours (i.e., phase 1b of the NASEM report in footnote 8) with a timely path to one full power year (i.e., phase 2 of the NASEM report), at a total capital cost that can attract private funding.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data