logo

Mill Creek Barrier Removal and Riparian Restoration Project in Talmage – P1696025

Sector: Bridge • Location: California, United States of America

Source: RCD Project Tracker

Project
Post-Implementation

This project removed and replaced an existing culverted stream crossing that was a barrier to fish passage to provide fish access to 7.5 miles of upstream salmonid spawning and rearing habitat in Mill Creek (Talmage), Russian River. The project was engineered and design plans were permitted with funds provided by the Caltrans Geyserville Bridge Mitigation Fund and CDFW's Fisheries Restoration Gran

Project Information FAQ

Project Information

5 Q
The project “Mill Creek Barrier Removal and Riparian Restoration Project in Talmage – P1696025” is an infrastructure initiative in the Bridge sector, located in California, United States of America. Taiyo aggregates data on it from RCD Project Tracker.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

post-implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project removed and replaced an existing culverted stream crossing that was a barrier to fish passage to provide fish access to 7.5 miles of upstream salmonid spawning and rearing habitat in Mill Creek (Talmage), Russian River. The project was engineered and design plans were permitted with funds provided by the Caltrans Geyserville Bridge Mitigation Fund and CDFW's Fisheries Restoration Grant Program. Project implementation removed the undersized culvert barrier, stream crossing fill, two large concrete aprons, and additional concrete rubble from the stream channel. An engineered 55-foot long free span bridge was installed according to existing design plans at the site.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data