Mill Creek Crossing
Sector: Power Transmission • Location: Kelowna, British Columbia, Canada
Source: Dodge USA
Design and construction of a new creek crossing that allows for additional bed load allowance, debris clearance and hydraulic capacity to pass the Q200 flow. Works include typical watercourse crossing scope such as temporary/permanent roadway works, temporary creek crossing, utility relocation and channel realignment works required for hydraulic capacity and erosion control.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design and construction of a new creek crossing that allows for additional bed load allowance, debris clearance and hydraulic capacity to pass the Q200 flow. Works include typical watercourse crossing scope such as temporary/permanent roadway works, temporary creek crossing, utility relocation and channel realignment works required for hydraulic capacity and erosion control. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
