logo
ProjectPlanning Schematics

Mill Point Solar 2 100 MW

Sector: Manufacturing (Industrial) • Location: Fultonville, New York, United States of America

Source: Dodge

to be determined - Phase 2 - solar power at scattered sites through out Glen

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT), Solar, Commercial
Location
Fultonville, New York, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Mill Point Solar 2 100 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mill Point Solar 2 100 MW” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Fultonville, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

to be determined - Phase 2 - solar power at scattered sites through out Glen

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Fultonville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Solar, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project