Mill Rd & Old Long Ridge Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The purpose of this project is to replace Bridge No. 135007 which is structurally deficient. The existing bridge was built in 1917 and consists of an 8-ft clear span cast-in-place concrete culvert. The structure carries one lane of traffic in each direction with an overall curb-to-curb width of 20-feet. There is a pipe handrail on the upstream side of the bridge and metal beam guide rail on the do
- Status
- Closed
- Sector
- Metal, Government, Car parking, Road, Cement, Rail, Bridge, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Stamford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mill Rd & Old Long Ridge Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to replace Bridge No. 135007 which is structurally deficient. The existing bridge was built in 1917 and consists of an 8-ft clear span cast-in-place concrete culvert. The structure carries one lane of traffic in each direction with an overall curb-to-curb width of 20-feet. There is a pipe handrail on the upstream side of the bridge and metal beam guide rail on the downstream side of the bridge. There are no sidewalks or curbs on either side. The replacement woul... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Stamford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Car parking, Road, Cement, Rail, Bridge, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
