Mill Road Infrastructure Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Mill Road Infrastructure Upgrades - The proposed work includes the supply and installation of approximately 360 metres of 450 mm diameter storm sewer, 180 metres of 375 mm diameter storm sewer, 250 metres of 300 mm diameter storm sewer, 50 metres of 250 mm diameter storm sewer, as well as any associated service laterals and appurtenances, reinstatement of the roadway, landscaping, and base asphalt
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Gagetown, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mill Road Infrastructure Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mill Road Infrastructure Upgrades - The proposed work includes the supply and installation of approximately 360 metres of 450 mm diameter storm sewer, 180 metres of 375 mm diameter storm sewer, 250 metres of 300 mm diameter storm sewer, 50 metres of 250 mm diameter storm sewer, as well as any associated service laterals and appurtenances, reinstatement of the roadway, landscaping, and base asphalt concrete, and the installment of curb and gutter on Mill Road within The Village of Gagetown. |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Gagetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
