Mill Run Trail Bridge Replacement
Sector: Forest Products and Packaging • Location: Cambridge, Ontario, Canada
Source: Dodge USA
The City is looking for a qualified vendor to carry out the replacement of the existing trail pedestrian bridge on Mill Run Trail, including removal and disposal of existing timber bridge superstructure frame, decking, guardrails, timber girders (logs) and accessories off site. Provision of new galvanized steel bridge superstructure and timber decking, new concrete abutments, concrete footings and
- Status
- Under Construction
- Sector
- Forest Products and Packaging, Steel, Road, Commercial, Cement, Bridge, Mass Transit, Government, Rail, Metal, Manufacturing (Industrial)
- Location
- Cambridge, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mill Run Trail Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City is looking for a qualified vendor to carry out the replacement of the existing trail pedestrian bridge on Mill Run Trail, including removal and disposal of existing timber bridge superstructure frame, decking, guardrails, timber girders (logs) and accessories off site. Provision of new galvanized steel bridge superstructure and timber decking, new concrete abutments, concrete footings and asphalt and gravel approaches as per the contract drawings and specifications. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Cambridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Steel, Road, Commercial, Cement, Bridge, Mass Transit, Government, Rail, Metal, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Evanston Centre
- Woodfibre LNG Project, British Columbia
- Aga Khan Museum + Ismaili Centre
- 728 Yonge
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
