MILLEN DOWNTOWN STREETSCAPE/GREENSPACE PRESERVATION @ 6 LOCS
Sector: Water Supply and Storage • Location: Millen, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Millen Downtown Streetscape/Greenspace Preservation Phase II:
- Masonic St: 6' concrete sidewalks with brick banding and 30" curb and gutter, 350 LF.
- Winthrope Ave: 5' concrete sidewalk with brick strips, 3.5'-5' wide landscaped strips (w/ irrigation). New handicap ramps and crosswalks. New 30" curb and gutter. 2600 LF.
- N Gray St: 9' concrete sidewalk with paving strips, new ramps and
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Car parking, Government, Automotive
- Location
- Millen, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about MILLEN DOWNTOWN STREETSCAPE/GREENSPACE PRESERVATION @ 6 LOCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Millen Downtown Streetscape/Greenspace Preservation Phase II: 1. Masonic St: 6' concrete sidewalks with brick banding and 30" curb and gutter, 350 LF. 2. Winthrope Ave: 5' concrete sidewalk with brick strips, 3.5'-5' wide landscaped strips (w/ irrigation). New handicap ramps and crosswalks. New 30" curb and gutter. 2600 LF. 3. N Gray St: 9' concrete sidewalk with paving strips, new ramps and crosswalks, new 30" curb and gutter. 1100 LF. 4. N Daniel St: 6’ concrete sidewalks with brick banding, 3.5’-4.5’ landscaped strips (street trees and irrigation). New ramps and crosswalks, new 30” curb and gutter. 5. Harvey St: 6’ concrete sidewalks with paving strips. New ramps and crosswalks, new 30” curb and gutter. 800 LF. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Millen |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Car parking, Government, Automotive |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
