Miller & Third Storm Drain Rehabilitation
Sector: Water Supply and Storage • Location: Gilroy, California, United States of America
Source: Dodge
This project would design and construct approximately 100 linear feet of new 18 storm drain pipe in the vicinity of the Miller Avenue/Third Street intersection. The project scope includes: Remove and replace 100 linear feet of existing 12 reinforced concrete pipe (RCP) with 18 RCP. Remove and relocate existing catch basin Connect new pipes to existing storm drain system The City of Gilroy May be S
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Road, Waste Processing and Treatment
- Location
- Gilroy, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Miller & Third Storm Drain Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project would design and construct approximately 100 linear feet of new 18 storm drain pipe in the vicinity of the Miller Avenue/Third Street intersection. The project scope includes: Remove and replace 100 linear feet of existing 12 reinforced concrete pipe (RCP) with 18 RCP. Remove and relocate existing catch basin Connect new pipes to existing storm drain system The City of Gilroy May be Seeking a Design for This project would design and construct approximately 100 linear feet of new ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Gilroy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Road, Waste Processing and Treatment |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
