Miller Avenue Rehabilitation
Sector: Cement • Location: Ann Arbor, Michigan, United States of America
Source: Dodge USA
The Miller Avenue Improvement Project consists of installing approximately 2900 feet of new water main and 1700 feet of new storm sewer between Newport Road and Chapin Street, the installation of a new Cycle Track from Maple Road to First Street, the realignment of the intersections at Miller / S Red Oak and Miller / S Seventh with the installation of new Rectangular Rapid Flashing Beacons (RRFBs)
- Status
- Closed
- Sector
- Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Ann Arbor, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Miller Avenue Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Miller Avenue Improvement Project consists of installing approximately 2900 feet of new water main and 1700 feet of new storm sewer between Newport Road and Chapin Street, the installation of a new Cycle Track from Maple Road to First Street, the realignment of the intersections at Miller / S Red Oak and Miller / S Seventh with the installation of new Rectangular Rapid Flashing Beacons (RRFBs) at Red Oak, along with associated concrete work, pavement markings, and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Ann Arbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
