Miller Dock
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Replacing and old dock with a new, smaller (96 square foot) L-shape aluminum dock on Timber Lake North.
- Status
- Prospective
- Sector
- Forest Products and Packaging, Manufacturing (Industrial), Commercial, Steel, Metal
- Location
- Shelton, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Miller Dock
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacing and old dock with a new, smaller (96 square foot) L-shape aluminum dock on Timber Lake North. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Shelton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Manufacturing (Industrial), Commercial, Steel, Metal |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
