logo

Miller Road Bridge Replacement under U.S. 219

Sector: Bridge • Location: Pennsylvania, United States

Source: AOL

Project
Under Construction

Replacement of the Miller Road Bridge under U.S. 219 with long-term lane closures in both northbound and southbound lanes. The project includes the construction of a mechanically stabilized earth wall to support highway overpasses and bridge abutments. Miller Road remains under a 4.7-mile detour.

Status
Under Construction
Sector
Bridge, Road
Location
Pennsylvania, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Miller Road Bridge Replacement under U.S. 219

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Miller Road Bridge Replacement under U.S. 219” is an infrastructure initiative in the Bridge sector, located in Pennsylvania, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the Miller Road Bridge under U.S. 219 with long-term lane closures in both northbound and southbound lanes. The project includes the construction of a mechanically stabilized earth wall to support highway overpasses and bridge abutments. Miller Road remains under a 4.7-mile detour.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project