Milling & Patching Roadways
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge USA
1.Contractor is to provide pavement maintenance services as follows: a.Mill existing asphalt surface to a depth of 2 inches. Material generated by milling activities to be turned over to the VA at a location directed by the Contract Officers Representative (COR). b.Placement of 2 of 12.5 F3 Top Course Asphalt with series 80 compaction.
- Status
- Prospective
- Sector
- Residential, Commercial, Bridge, Road, Manufacturing (Industrial)
- Location
- Bath, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Milling & Patching Roadways
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.Contractor is to provide pavement maintenance services as follows: a.Mill existing asphalt surface to a depth of 2 inches. Material generated by milling activities to be turned over to the VA at a location directed by the Contract Officers Representative (COR). b.Placement of 2 of 12.5 F3 Top Course Asphalt with series 80 compaction. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Bath |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Bridge, Road, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
