Milling Existing Pavement and Resurfacing
Sector: Water Supply and Storage • Location: Greenville, Illinois, United States of America
Source: Dodge
Along Dewey Street from College Avenue to Killarney Drive Milling existing pavement and resurfacing with new surface course on the northern section (336.5 feet) of Dewey Street. The remainder of the roadway within the project limits will be removed and reconstructed with new asphalt binder and surface course. A new storm system will also be installed along Dewey Street. 20200100 - EARTH EXCAVATION
- Status
- Closed
- Sector
- Water Supply and Storage, Cable car, Telecommunications, Waste Processing and Treatment, Government, Commercial, Car parking, Automotive, Road, Manufacturing (Industrial)
- Location
- Greenville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Milling Existing Pavement and Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Along Dewey Street from College Avenue to Killarney Drive Milling existing pavement and resurfacing with new surface course on the northern section (336.5 feet) of Dewey Street. The remainder of the roadway within the project limits will be removed and reconstructed with new asphalt binder and surface course. A new storm system will also be installed along Dewey Street. 20200100 - EARTH EXCAVATION - 1600 CU YD 20800150 - TRENCH BACKFILL - 205 CU YD 25000100 - SEEDING, CLASS 1 - 0.25 ACRE 2500... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Greenville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Telecommunications, Waste Processing and Treatment, Government, Commercial, Car parking, Automotive, Road, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
