Millmerran CoalFired Power Station Australia
Source: Power Technology
Millmerran Power is a twounit 850MWgenerating power station near Millmerran in South West Queensland One of the most energy efficient coalfired projects in Australia the power station uses a supercritical boiler with low nitrogenoxide burners that cut NOx emissions by 50 to 70 Commissioned in 2002 Millmerran cost AUS 15bn and is owned and operated by InterGen The station supplies baseload power an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Millmerran Power is a twounit 850MWgenerating power station near Millmerran in South West Queensland One of the most energy efficient coalfired projects in Australia the power station uses a supercritical boiler with low nitrogenoxide burners that cut NOx emissions by 50 to 70 Commissioned in 2002 Millmerran cost AUS 15bn and is owned and operated by InterGen The station supplies baseload power and came on line early in 2003 It supplies enough electricity to power approximately 11 million homes Millmerran Power sells all its electricity into the National Electricity Market NEM and in recent years has been achieving capacity factors of more than 85 The power station won the Banksia Environmental Award 2006 in the water category Coal comes from the adjacent opencut Commodore mine InterGen completed the debt financing in August 1999 Financing was arranged by ABN AMRO ANZ Investment Bank BankAmerica Commonwealth Bank of Australia and the National Australia Bank BOS International KBC Bank Overseas Union Bank Bayerische Hypound Vereinsbank and Royal Bank of Scotland are also reported to have committed funds Bechtel Power constructed the project under a lumpsum turnkey contract At the time Millmerran was the largest fully merchant greenfield plant to be financed on a nonrecourse basis Electricity demand had been growing at 3 annually and without an additional power station would have overtaken the available supply by 2002 Construction created around 1200 jobs BlueScope Steel provided structural and cladding The Millmerran Operating Company now employs 50 people directly and 150 people indirectly including coal mine employees and other subcontractors CBH performs unit outage work maintenance The plant has operated more than five years with no Lost Time Injuries In April 2005 InterGen shareholders Shell Generating and Bechtel Enterprises Energy announced their decision to sell InterGen NV and ten of its power plants to a partnership between AIG Highstar Capital and Ontario Teachers Pension Plan The purchase was completed in August 2005 for US 175bn Millmerran uses a supercritical oncethrough boiler so produces lower greenhouse gas emissions than conventional coalfired types It operates at temperatures around 540C and pressures of 24 Mega Pascal These high temperatures and pressures can accelerate corrosion of the boiler tubes The Oxygenated Treatment oxygen injection process control uses an advanced proportional integral and derivative controller APID that regulates the operation of the servo control valve There were initially some stability problems during load changes because of a large up to 15 minute dead time mainly the time between which oxygen gas was injected and the dissolved oxygen was detected in the feed water In a University of Southern Queensland project the dead time was reduced by simply moving the injection point nearer the oxygen sensor so giving fast and stable control response That helped maintain the protective oxide layer so reducing the chanceof oxide exfoliation which can lead to boiler tube failures and power plant shut down Millmerran burns 36 million tons of coal a year It uses air cooling to condense the steam from the turbine exhaust and so consumes 90 less water than conventional coal firedpower projects Waste water from Wetalla Sewage Treatment Plant at Toowoomba is used as production water so no surface water or groundwater resources are used All runoff water is contained on site and is reused ensuring no sediment enters local waterways All waste ash from the combustion process is deposited back in the mine to avoid the need for an environmentally hazardous ash store dam A program to plant trees around the 9000 hectare site will help link wildlife corridors on the project land as well as protect a rare grass species Millmerrans Environmental Monitoring Program assesses any impacts on water air soil flora and fauna The power station performs monthly monitoring of surface water sedimentdust quality weather and climatic conditions noise levels emissions screening and agricultural impacts Only a small portion of the 9115 hectares occupied by Millmerran is used for the power station and mine infrastructure The remainder is a large buffer zone between the project and its neighbors Get industry leading news data and analysis delivered to your inbox |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
