logo

Mill/Overlay - Newton Street & Nash Drive

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Project
Closed

: The scope of work consists of removing and replacing damaged sub-grade and concrete pavement and damaged concrete curb and gutter at various locations along Newton Street from N. Colony Blvd. to Ethridge Drive 2,000 feet, and Nash Drive from Main Street to John Yates Drive 3200 feet. After panel repairs have been completed, grind off 1-inch of the existing concrete pavement at a width of 33 feet

Status
Closed
Sector
Cement, Government, Road, Manufacturing (Industrial), Commercial
Location
The Colony, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Mill/Overlay - Newton Street & Nash Drive

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mill/Overlay - Newton Street & Nash Drive” is an infrastructure initiative in the Cement sector, located in The Colony, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

: The scope of work consists of removing and replacing damaged sub-grade and concrete pavement and damaged concrete curb and gutter at various locations along Newton Street from N. Colony Blvd. to Ethridge Drive 2,000 feet, and Nash Drive from Main Street to John Yates Drive 3200 feet. After panel repairs have been completed, grind off 1-inch of the existing concrete pavement at a width of 33 feet and place a 2-inch thick by 33 feet wide Hot-mix asphalt pavement overlay on both Newton Street ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

The Colony

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Road, Manufacturing (Industrial), Commercial

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project