logo
ProjectPre-Design

Millstone Borough Sanitary Sewer System

Pre-design · New Jersey · Last reported Mar 2025

Source: Dodge

The Borough is interested to install new sanitary sewer system to connect failing septics throughout the Borough. A Pump station will be required in addition to sanitary sewer conveyance infrastructure. During these efforts, the borough will evaluate and form a sewer utility and further consideration for the feasibility to incorporate a storm water utility as well.

Status
Prospective
Sector
Water Supply and Storage, Manufacturing (Industrial), Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
Location
Hillsborough Township, New Jersey, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Millstone Borough Sanitary Sewer System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Millstone Borough Sanitary Sewer System” is an infrastructure initiative in the Water Supply and Storage sector, located in Hillsborough Township, New Jersey, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Borough is interested to install new sanitary sewer system to connect failing septics throughout the Borough. A Pump station will be required in addition to sanitary sewer conveyance infrastructure. During these efforts, the borough will evaluate and form a sewer utility and further consideration for the feasibility to incorporate a storm water utility as well.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

Hillsborough Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project