logo
ProjectPre-Design

Millstream Drive Sidewalk

Pre-design · Virginia · Last reported Feb 2025

Source: Dodge

This project provides for the design, right-of-way acquisition, and construction of a 0.07-mile sidewalk segment along the south side of Millstream Drive between Village Center Plaza / Loudoun Park and Ride to an existing sidewalk east of Stone Carver Drive. This project was prioritized as a part of the 2020 Sidewalk and Trail Prioritization Study Loudoun County Division of Procurement may be seek

Status
Prospective
Sector
Government, Commercial, Power Transmission, Car parking, Power Generation (CCGT), Automotive
Location
Stone Ridge, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Millstream Drive Sidewalk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Millstream Drive Sidewalk” is an infrastructure initiative in the Government sector, located in Stone Ridge, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project provides for the design, right-of-way acquisition, and construction of a 0.07-mile sidewalk segment along the south side of Millstream Drive between Village Center Plaza / Loudoun Park and Ride to an existing sidewalk east of Stone Carver Drive. This project was prioritized as a part of the 2020 Sidewalk and Trail Prioritization Study Loudoun County Division of Procurement may be seeking a consultant to provide design services for the Millstream Drive Sidewalk. Loudoun County Div...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Stone Ridge

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Power Transmission, Car parking, Power Generation (CCGT), Automotive

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project