Millville WWTP 3rd Secondary Clarifier Addition
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
constructing a new (third) secondary clarifier, a scum pump station, modifications/additions to yard piping including above-grade scum collection lines, a new RAS meter vault and flow control valve, piping connection to the existing RAS Pump Station wet well, constructing a walkway from the splitter box to the new clarifier, plumbing, electrical and instrumentation/SCADA systems, including pipe he
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Millville, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Millville WWTP 3rd Secondary Clarifier Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | constructing a new (third) secondary clarifier, a scum pump station, modifications/additions to yard piping including above-grade scum collection lines, a new RAS meter vault and flow control valve, piping connection to the existing RAS Pump Station wet well, constructing a walkway from the splitter box to the new clarifier, plumbing, electrical and instrumentation/SCADA systems, including pipe heat tracing, and appurtenant work as described in the project specifications. The project is locat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Millville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
