Milot - Morine Highway

Sector: Road • Location: Albania

Source: World Bank Group

Project
Active

The project envisages the rehabilitation, operation and maintenance of Milot - Morine Highway in Albania with a total length of 114.5 kilometers.

After the failure of three tenders in prior years, the Ministry of Transport opened a fourth tender with different conditions in early 2016 and closed on 31 May 2016. Following the competitive bidding auction based on the lowest revenue subsidy by the

Project Information FAQ

Project Information

5 Q
The project “Milot - Morine Highway” is an infrastructure initiative in the Road sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project envisages the rehabilitation, operation and maintenance of Milot - Morine Highway in Albania with a total length of 114.5 kilometers. After the failure of three tenders in prior years, the Ministry of Transport opened a fourth tender with different conditions in early 2016 and closed on 31 May 2016. Following the competitive bidding auction based on the lowest revenue subsidy by the government - Vendeka Consortium was awarded the contract. However, Catalyst Consortium filed a complaint with the Public Procurement Commission (CPC) after the official deadline for appeal had expired. As a result, the commission suspended the Vendeka Bilgi contract and award it to the second bidder - Catalyst, consisting of Catalyst Viva Das General Contracting LLC (EBA), Salillari shpk (Albania), Bee Tech (Greece), Violiap Ates (Greece) and Kastrati sha (Albania). The concession is for a period of 30 years during which the consortium will recoup its investments through toll collection along with revenue subsidy for missing traffic of Euro 5 million per year for the first 13 years of the concession. This translates into Euro 65 million ($70.8 million) in revenue subsidy. The rehabilitation of the road will cost $47.3 million and the consortium will invest Euro 218 million ($237.3 million) over the life span of the contract. Financial details for equity and debt are not available as of August 2017. However, IFC sources reported the project to have achieved FC in May 2017. http://www.lapsi.al/lajme/2017/06/13/rruga-e-kombit-me-pages-subvencion-649-milion-euro-koncesionarit#.WaaiacgjGUk http://www.exit.al/2017/06/13/koncesioni-i-rruges-se-kombit-66-milione-euro-nga-buxheti-i-shtetit/ Catalyst consortium, consisting of Catalyst Viva Das General Contracting LLC (EBA), Salillari shpk (Albania), Bee Tech (Greece), Violiap Ates (Greece) and Kastrati sha (Albania).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data