Minas Gerais Water Quality and Pollution Control
One of 10,000+ projects Taiyo tracks in Brazil.
Source: World Bank Group
The principal objective of the project is to recuperate the environmentally deteriorated urban basins of the Arrudas and Onca rivers in the metropolitan area of Belo Horizonte, one of the most congested industrial areas in Brazil. The project consists of five main components: (i) flood control and urban drainage, including macrodrainage of all rivers and creeks in the water basin; (ii) municipal a
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Biomass, Raw Materials, Waste Processing and Treatment, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Minas Gerais Water Quality and Pollution Control
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The principal objective of the project is to recuperate the environmentally deteriorated urban basins of the Arrudas and Onca rivers in the metropolitan area of Belo Horizonte, one of the most congested industrial areas in Brazil. The project consists of five main components: (i) flood control and urban drainage, including macrodrainage of all rivers and creeks in the water basin; (ii) municipal and industrial sewage collection and treatment; (iii) municipal and industrial solid waste collection and disposal, which includes improvements in solid waste collection in the area and a sanitary landfill; (iv) urbanization including the creation of public areas, restoration of vegetation and resettlement; and (v) environmental protection and waterbasin management, including studies for the protection of the das Velhas river and control of industrial pollution in the area and institutional strengthening of the State Environmental Agency (FEAM). |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Biomass, Raw Materials, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
