Minden Pipeline
Sector: Water Supply and Storage • Location: Avoca, Iowa, United States of America
Source: Dodge USA
Construction of approximately 18 miles of 12-inch pipe along 330th Street, Idlewood Road, 320th Street, and Highway 6. The project includes directionally drilled crossings, mainline valves, flushing hydrants, and other appurtenant work to complete the project. Additionally, the project includes the construction of a meter vault.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Avoca, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Minden Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of approximately 18 miles of 12-inch pipe along 330th Street, Idlewood Road, 320th Street, and Highway 6. The project includes directionally drilled crossings, mainline valves, flushing hydrants, and other appurtenant work to complete the project. Additionally, the project includes the construction of a meter vault. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Avoca |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
