logo
ProjectCompleted

Mindoro Resources Ltd

One of 10,000+ projects Taiyo tracks in Philippines.

Source: International Finance Corporation (IFC)

Mindoro Resources Ltd. (“Mindoro” or the “Company”), through 100% owned subsidiary MRL Gold Phils. Inc (MRL Gold) owns 75% of the Agata nickel project. The project description remains largely as stated in the original ESRS with the following exceptions; staffing levels in the Philippines were reduced due to the 2009 downturn to about 30 currently (but expected to ramp up again). The proposed IFC

Status
Closed
Sector
Road, Water Supply and Storage, Government
Location
Philippines
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Mindoro Resources Ltd

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mindoro Resources Ltd” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mindoro Resources Ltd. (“Mindoro” or the “Company”), through 100% owned subsidiary MRL Gold Phils. Inc (MRL Gold) owns 75% of the Agata nickel project. The project description remains largely as stated in the original ESRS with the following exceptions; staffing levels in the Philippines were reduced due to the 2009 downturn to about 30 currently (but expected to ramp up again). The proposed IFC investment in Mindoro is solely for funding ongoing resource drilling, feasibility and other studies, and exploration work with a limited footprint. The proposed IFC investment is approximately $2.1 million. IFC recognizes that the exploration project has the long-term potential to develop into a world class nickel resource and large-scale mine. The intent of a DSO operation would be as a first phase to generate cash flow for the Company as a step towards a potential larger scale development. For each phase of development IFC will require appropriate documentation meeting the IFC Performance Standards. Thus, an ESIA will be required for any DSO operation and a further ESIA for any larger scale development. The documentation at each stage will be subject to a full Free Prior Informed Consultative process. Any future IFC investments will be categorized according to impacts generated by that project.

Original sector

BD - Nickel

Location

Country

Philippines

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project