logo

MINGECHAUR POWER PROJECT

Sector: Hydro • Location: Azerbaijan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The project comprises: (i) the replacement of the existing four generator units at Mingechaur Hydropower Plant; (ii) reconstruction of the back-up 120 km high-voltage power transmission line (330kV); and (iii) installation of a sub-station at Agcabedi with associated connection line (110 kV) to the Barda region. The project objectives are to: (i) complete commercialisation of the power sector; (ii

Project Information FAQ

Project Information

4 Q
The project “MINGECHAUR POWER PROJECT” is an infrastructure initiative in the Hydro sector, located in Azerbaijan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises: (i) the replacement of the existing four generator units at Mingechaur Hydropower Plant; (ii) reconstruction of the back-up 120 km high-voltage power transmission line (330kV); and (iii) installation of a sub-station at Agcabedi with associated connection line (110 kV) to the Barda region. The project objectives are to: (i) complete commercialisation of the power sector; (ii) reduce consumption of fossil fuel and atmospheric pollution by substituting hydropower for tradable oil and imported gas; and (iii) improve energy efficiency by reducing power transmission losses. Azerenerji was transformed into a joint-stock company in accordance with the loan agreement under the Yenikend renewable energy project (signed December 1994). The second loan will enable the Government to complete the commercialisation of Azerenerji, to further increase tariff and financial discipline in the sector and to set up a transparent legal and regulatory system. The proposed project will encourage the process of privatisation of selected power stations, which is being discussed with several investors. The borrower is Azerenerji, a state-owned joint-stock power company responsible for power generation, transmission and distribution as well as the operation of the country's heating systems. EBRD loan of US$ 21.65 million (ECU 19.86 million). Co-financed with Azerenerji, Islamic Development Bank and EC Tacis. US$ 44.62 million (ECU 40.94 million). The project was screened as category B/1, requiring partial environmental assessment and environmental audit. Under the Bank-funded technical cooperation, an international consultant prepared the Environment Audit and Assessment Report for the project. Technical cooperation funding of US$ 2.89 million was arranged to improve Azerenerji's commercial management system and to prepare an action plan for development of the power market.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data