MINGECHAUR POWER PROJECT
Sector: Government • Location: Azerbaijan
Source: European Bank for Reconstruction and Development (EBRD)
The project comprises: (i) the replacement of the existing four generator units at Mingechaur Hydropower Plant; (ii) reconstruction of the back-up 120 km high-voltage power transmission line (330kV); and (iii) installation of a sub-station at Agcabedi with associated connection line (110 kV) to the Barda region. The project objectives are to: (i) complete commercialisation of the power sector; (ii
- Status
- Closed
- Sector
- Government, Hydro, Natural Gas, Power Generation (CCGT), Residential, Oil and Gas, Power Transmission, Commercial
- Location
- Azerbaijan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about MINGECHAUR POWER PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises: (i) the replacement of the existing four generator units at Mingechaur Hydropower Plant; (ii) reconstruction of the back-up 120 km high-voltage power transmission line (330kV); and (iii) installation of a sub-station at Agcabedi with associated connection line (110 kV) to the Barda region. The project objectives are to: (i) complete commercialisation of the power sector; (ii) reduce consumption of fossil fuel and atmospheric pollution by substituting hydropower for tradable oil and imported gas; and (iii) improve energy efficiency by reducing power transmission losses. Azerenerji was transformed into a joint-stock company in accordance with the loan agreement under the Yenikend renewable energy project (signed December 1994). The second loan will enable the Government to complete the commercialisation of Azerenerji, to further increase tariff and financial discipline in the sector and to set up a transparent legal and regulatory system. The proposed project will encourage the process of privatisation of selected power stations, which is being discussed with several investors. The borrower is Azerenerji, a state-owned joint-stock power company responsible for power generation, transmission and distribution as well as the operation of the country's heating systems. EBRD loan of US$ 21.65 million (ECU 19.86 million). Co-financed with Azerenerji, Islamic Development Bank and EC Tacis. US$ 44.62 million (ECU 40.94 million). The project was screened as category B/1, requiring partial environmental assessment and environmental audit. Under the Bank-funded technical cooperation, an international consultant prepared the Environment Audit and Assessment Report for the project. Technical cooperation funding of US$ 2.89 million was arranged to improve Azerenerji's commercial management system and to prepare an action plan for development of the power market. |
Original sector | Energy |
Location
Country | Azerbaijan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Government, Hydro, Natural Gas, Power Generation (CCGT), Residential, Oil and Gas, Power Transmission, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project