Minh Luong SHPP

Sector: Wind • Location: Vietnam

Source: World Bank Group

Project
Active

Minh Luong Hydro Power JSC (may be a subsidiary of HACO Group, Vietnam) developed the 22.5MW Minh Luong small hydropower plant, Ngoi Dien River, Van Ban district, Lao Cai province. The project consisted of two turbines of 11.25MW each and was expected to generate 102,430 MWh annually.

Annual tariff was expected to be VND 590/kWh. Operating life was 30 years. Construction period 3 years. Corporat

Status
Prospective
Sector
Wind, Hydro, Power Generation (CCGT), Tunnel, Commercial, Government
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Minh Luong SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Minh Luong SHPP” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Minh Luong Hydro Power JSC (may be a subsidiary of HACO Group, Vietnam) developed the 22.5MW Minh Luong small hydropower plant, Ngoi Dien River, Van Ban district, Lao Cai province. The project consisted of two turbines of 11.25MW each and was expected to generate 102,430 MWh annually. Annual tariff was expected to be VND 590/kWh. Operating life was 30 years. Construction period 3 years. Corporate tax rate 15%. An MoU with EVN was signed in January 2005. The technical design was completed in July 2005. The EIA was approved by the Department of Natural Resources and Environment of the Lao Cai province in March 2006. The construction contract was signed in February 2007. The construction contract for the tunnel and foundation intake was signed in October 2008. Commissioning was expected for March 2012. Total capital cost was estimated at VND 369.5 billion (US$17.7 million), at 70/30 debt to equity. the ROE was estimated at 24.63% based on Morningstar International Cost of Capital (2006). The debt rate was estimated at 11.4%, based on Annual Report of State Bank of Vietnam (2006). The project applied for UNFCCC CDM financing. The financial closure date was unavailable. The project was expected to be closed in March 2012, but this was unconfirmed. Hence the project is reported as under development. Project location: 22o 02’38.5” North latitude 104o 05’30.5” East longtude http://cdm.unfccc.int/filestorage/N/5/I/N5ISR328DQPEK79YCFZMA6HTLGBV04/4991%20PDD.PDF?t=WE98bWkya2kxfDBnMhqUM2u_ha86FxR9T2JB

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Hydro, Power Generation (CCGT), Tunnel, Commercial, Government

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project