Minneapolis City Hall Exterior Improvements Phase 3 REBID
Sector: Government • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
REMOVE BUILT-UP ROOFING DOWN TO EXISTING CONCRETE DECK AT LEVEL 13. REPAIR/REPLACE DECK AS REQUIRED FOR COLD FLUID APPLIED WATERPROOFING INSTALLATION. INSTALL NEW COLD FLUID-APPLIED WATERPROOFING SYSTEM
- Status
- Closed
- Sector
- Government, Cement, Manufacturing (Industrial), Commercial
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Minneapolis City Hall Exterior Improvements Phase 3 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | REMOVE BUILT-UP ROOFING DOWN TO EXISTING CONCRETE DECK AT LEVEL 13. REPAIR/REPLACE DECK AS REQUIRED FOR COLD FLUID APPLIED WATERPROOFING INSTALLATION. INSTALL NEW COLD FLUID-APPLIED WATERPROOFING SYSTEM |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
