Minnesota Energy Connection - Transmission Line
Sector: Wind • Location: Becker, Minnesota, United States of America
Source: Dodge USA
double-circuit 345-kilovolt transmission line connecting new renewable energy to the retiring Sherco power plant's existing grid connections from Becker t- Monticello - an approximately 170-mile-long transmission line that would connect new low-cost wind and solar energy in southwest Minnesota between Lyon County and Becker.
- Status
- Prospective
- Sector
- Wind, Solar, Commercial, Road, Power Generation (CCGT), Power Transmission
- Location
- Becker, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Minnesota Energy Connection - Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | double-circuit 345-kilovolt transmission line connecting new renewable energy to the retiring Sherco power plant's existing grid connections from Becker t- Monticello - an approximately 170-mile-long transmission line that would connect new low-cost wind and solar energy in southwest Minnesota between Lyon County and Becker. |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Becker |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Solar, Commercial, Road, Power Generation (CCGT), Power Transmission |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
